3S – 3 sections for touristic purpose

on-site assessment and engineering calculations

3S – 3 sections for touristic purpose

United Arab Emirates

This project was executed in cooperation with Cable Car Consultants.

CCS was responsible for on-site analyses, preparing engineering calculations and technical drawings of profiles for ropeways connecting beach area with local hills. The whole route consisted of 3 sections of total length of 20 km.

scroll top